ETPACK’s carbon statement
Since the commissioning of the 100 Kwp solar power plant at the end of November 2021, installed on ETPACK factory roof, The power plant has generated 153 Mwh, of which…
Since the commissioning of the 100 Kwp solar power plant at the end of November 2021, installed on ETPACK factory roof, The power plant has generated 153 Mwh, of which…
Depuis la mise en service fin novembre 2021, de la centrale solaire de 100 kwp, installée sur notre site ETPACK, la centrale à produit : 153MWh dont 82 MWh auto…